Fire Strategy
Loading...
RobinsFire
Cambs Fire Safe
Fire Strategy Builder
Reviewing
Returned for changes Address reviewer flags, then re-submit.
Amendment
!
Client-requested amendment
Log a change the client has asked for. This bumps the revision number, opens the strategy for editing, and routes the close-out through either the clerical or the substantive path.
🔗
Share fire strategy
Generate a read-only link to send to architects / M&E / clients. The recipient sees the same rendered PDF you do — no Hub login needed. Treat each URL as confidential; anyone with it can view.
👁 PDF preview
Finalising strategy
Confirm the final details before this strategy is marked Approved.
01
Project setup
Document metadata and team — populates the cover page and headers.
Premises / project name
Project no.
Document number
Revision
Status
Date of issue
Compliance route preset — pre-ticks typical guidance docs on Step 3 and prints on the cover. You stay in control: untick / add anything on Step 3.
Design stage / completion — printed on the cover doc-strip and shown as a chip on the Jobs board
Client name — appears top-right of each page (e.g. "Norder Consulting")
Prepared by
Reviewed by
Branding
Sets the header logo and footer name in the rendered PDF.
02
Building context & project scope
Answer in your own words — these descriptions are read into the report's Development Summary and feed the guidance suggestions on the next step.
What kind of building is this?
Occupancy / how is it used?
Storeys (no.)
Top occupied floor (m)
Approx floor area (m²)
Construction
Evacuation strategy — controls which stair/exit-width tables apply
Sprinklered — affects FR periods and travel distances
Jurisdiction
Any special hazards or unusual features?
Project scope — is this new build / existing / refurb / change of use? Implicates whether regs are retrospective.
Compliance route
Strategy depth
ADB purpose group — optional, only when ADB applies
Scope of works — bullets, one per line. Renders into the Executive Summary.
03
Applicable guidance documents
Tool suggests documents based on Step 2. Adjust freely — you have final call. Selected docs become the citation context for Step 4 (Sections).
ADB Purpose Group — narrows guidance to clauses applicable to this category
Mixed-use or unsure? Pick "Mixed / skip" and guidance won't be narrowed. Only affects ADB-style docs that declare a purpose group on each clause — other docs are unaffected.
04
Clauses
Starts from the CIBSE Guide E framework. Adapt as you wish — add, rename, remove, reorder. Click any clause to open the focused editor.
05
Drawings & figures
Upload site plans, GA layouts, fire strategy plans. They render in the drawings appendix at the end of the PDF, captioned.
06
Review & output
Quick summary, then submit for reviewer or render the PDF directly.