Loading...
RobinsFire
Cambs Fire Safe
Report Writing
Amendment
Finalising report
Confirm the final details before this report is marked Approved. Anyone delivering to the client will see what's set here.
Reviewing
Before we start
The methodology choice and the premises descriptive use shape the entire report. Get this right and the rest writes itself; get it wrong and every section that follows is downstream of the mistake.
Methodology ↓ shapes every step
Pick the right methodology for these premises
This decides which checklist questions get asked, which sections appear in the report, and which finding templates are used. Simple is for simple — if there's any complexity (multiple tenants, taller than 4 storeys, sleeping risk, vulnerable occupants, unusual construction) pick Complex.
Heads-up: "Simple" really means simple. You'll be asked to confirm before continuing past the Notes step — switching after observations are extracted is painful.
Premises Sub-Type
The premises name is the key identifier across the whole report — observations, photos and the saved file all link to it. Avoid changing it once you've started a write-up.
Premises Name / Address
Descriptive use — one line
A single sentence describing what this premises actually is. Cinder reads it to calibrate the report's tone and proportionality, and it prints on the cover.
General Context (optional)
Reviewer · Step 1
Confirm the premises details look right, then tick this step off.
Report Details
Address, document reference, building details and occupancy information for the final report — every field here flows into the rendered PDF.
Premises Address
Postal address as it should appear on the report front cover.
Address Line 1
Address Line 2 (optional)
Town / City
Postcode
Document Reference
Document number, revision, status and branding — controls the title block and the report cover.
Document Number
Revision
Status
Report Branding
Premises Particulars
Use, occupancy, hours, construction, logbook and history — the building's profile in the Methodology and Premises sections of the PDF.
Building Use Classes
Approximate Number of Occupants / Staff
Maximum Number of Public at Any One Time
Associated Times / Hours of Occupation
Number of Floors
Floor Area (m²)
Enforcement Body
Maintenance Log Book
Previous Fire Loss
Previous Assessment
Next Review Date
Occupants Especially at Risk
Sleeping, disabled, lone workers, young persons — populates the "occupants at particular risk" block of the report.
Sleeping Occupants
Disabled Employees
Other Disabled Persons
Remote / Lone Workers
Young Persons
Further Details (optional)
Drawings & Layouts
Floor plans / escape route drawings that get appended to the back of the PDF. Tick "drawings to follow" if they aren't ready yet.
Personnel
Responsible Person, competent person and the person in charge of fire safety arrangements — named in the Executive Summary opening.
Responsible Person (RP)
Competent Person
Person in Charge of Fire Safety Arrangements
Assessment Details
Report type, FRA type, date, assessor and reviewer — signoff block on the report cover.
Report Type swaps every "Fire Risk Assessment" label → "Deficiency Report" in the PDF + UI
Type of FRA for domestic (SD/CD): Type 1–4 per BS 9792:2025 §5.c) — the scope of the inspection
Role of second person used in the opening sentence — leave blank to auto-pick from methodology
Date of Assessment
Assessor Name
Reviewed By
Terms of Reference
Tick the legislation and guidance applicable to this assessment — these appear in the Methodology section of the report. Add a custom item below if something you need isn't listed.
Reviewer · Step 2
Confirm the report details, methodology and ToR are right, then tick this step off.
Locked — review in progress. These site observations are read-only for now to stop the AI-generated report being overwritten by accident. Make any edits in Step 5 (Report); the assessor can revise the notes again after a fresh write-up cycle.
What did you observe?
Dump everything into the site record — talk it out in whatever order it comes to you. The AI files every fact to the right report section at the next step, so structure doesn't matter here. The Coverage Review panel on the right shows what you haven't covered yet.
🧠
Site record
Dump everything here
Talk or type it all — hazards, escape, systems, management, maintenance, in any order. Every fact gets filed to the correct report section automatically at the next step.
Everything you saw
Dictate
✦ Cinder Notes Check
Opens Cinder and checks your notes for gaps before building the report.
Extracting observations from your notes...
Coverage
Not reviewed
Cinder reads everything you’ve written and checks it against what a suitable and sufficient assessment of this premises must evidence. Run it whenever you want the second pair of eyes.
Locked — review in progress. Coverage assignments and the report builder are read-only here. Clicking "Build Report" again would regenerate every narrative and wipe reviewer notes/flags. Make changes in Step 5 (Report).
AI Coverage Review
Every observation extracted from your notes is listed below. Verify each item is correctly categorised, move anything misplaced, and mark anything not applicable as N/A before building the report.
✦ Cinder briefed
Building profile + risk steer on file — Cinder will read this when writing every section narrative.
✦ Cinder Briefing ↓ feeds Build Report
Brief Cinder on this building
Cinder reads this when writing every section narrative — it's how proportionality, tone and risk emphasis get calibrated across the report. Fill it in before clicking Build Report.
Building profile
Overall risk steer optional
Building report sections...
Report Builder
Review each AI-drafted narrative. Orange accent = in progress · green ribbon = marked complete · grey in the status panel = no observations recorded (confirm N/A or add detail).
⚠ Assessor review required
All content below is AI-assisted from your notes. You are responsible for reviewing every narrative and finding for accuracy before generating the final report — this is a legal document.
✓ AI content acknowledged · all sections require your review
Section Status
Section
Current Narrative
What to include or change (optional)
Executive Summary
Set the risk level, add any context, then generate the executive summary. Every field on this step lands on the PDF cover and exec page.
Risk Determination
Step through A → B → C. Picking a row in A and B auto-derives the overall risk in C.
ATaking into account the fire prevention measures observed, the likelihood of fire at these premises is:
Assessed Likelihood of Fire
LowUnusually low likelihood of fire as a result of negligible potential sources of ignition.✓ Assessed
MediumNormal fire hazards (eg potential ignition sources) for this type of occupancy, with fire hazards generally subject to appropriate controls (other than minor shortcomings).✓ Assessed
HighLack of adequate controls applied to one or more significant hazards, such as to result in significant increase in likelihood of fire.✓ Assessed
BTaking into account the nature of the building and its occupants, as well as the fire protection and procedural arrangements, the potential consequences for life safety in the event of fire would be:
Assessed Potential Consequences in the Event of Fire
Slight HarmOutbreak of fire unlikely to result in serious injury or death of any occupant (other than an occupant sleeping in a room where a fire occurs).✓ Assessed
Moderate HarmOutbreak of fire could foreseeably result in injury (including serious injury) of one or more occupants, but it is unlikely to involve multiple fatalities.✓ Assessed
Extreme HarmSignificant potential for serious injury or death of one or more occupants.✓ Assessed
CAs a result of this assessment, the OVERALL FIRE RISK for the premises is considered to be:
Likelihood of Fire
× Consequences
Slight Harm Moderate Harm Extreme Harm
Low Trivial Risk Tolerable Risk Moderate Risk
Medium Tolerable Risk Moderate Risk Substantial Risk
High Moderate Risk Substantial Risk Intolerable Risk
DA suitable risk-based control plan should involve effort and urgency that is proportionate to risk. The following risk-based control plan is based on one advocated by BS 8800 for general health and safety risks:
Recommended Action and Timescale
TrivialNo action is required and no detailed records need be kept.✓ Assessed
TolerableNo major additional controls required. However, there might be a need for improvements which involve minor or limited cost.✓ Assessed
ModerateIt is essential that efforts are made to reduce the risk. Risk reduction measures should be implemented within a defined time period. Where moderate risk is associated with consequences which constitute extreme harm, further assessment might be required.✓ Assessed
SubstantialConsiderable resources might have to be allocated to reduce the risk. If the building is unoccupied, it should not be occupied until the risk has been reduced. If the building is occupied, urgent action should be taken.✓ Assessed
IntolerableBuilding (or relevant area) should not be occupied until the risk has been reduced.✓ Assessed
The main reason behind the rating you've chosen. Feeds the executive summary verbatim and gives the reviewer a fast read on your judgement. Keep it specific to this premises.
Your reasoning for the rating. Not printed in the FRA — it feeds Cinder's context, the pre-flight risk check, and the Client Summary's narrative so they can explain the rating the way you would.
Steer for the Executive Summary ↓ feeds Generate
Fill this in before clicking Generate. Construction details, occupancy nuance, anything specific that should land in the executive summary tone — Cinder reads this and shapes the writing around it.
Uses risk rationale + steer above
Writing executive summary...
Reading notes Building sections Drafting summary
Getting started…
Hang tight…
Photo Library
No photos loaded
Click a tile to view full size · tick to select multiple
0 / 0Use ← / → to navigate · Enter to attach · Esc to close
Cinder
Ready to help